1930s semi-detached houses with hipped roofs

Skylights & rooflights
in Stratton St Margaret

Stratton St Margaret kept its village centre while Swindon's northern growth closed in around it: older cottages by the parish church, then interwar semis, post-war estates and recent culs-de-sac in turn. Roof windows for pitched slopes, rooflights for flat extensions and sun tunnels for dark halls all find a place here.

Get a free quote

011930s semis on a suburban road

Flashing kit around a roof window on concrete tiles
02The flashing that keeps the water out

What the age of a Stratton house settles

  • Cottage or cul-de-sac

    A house by the church and a house on a 1990s close are built differently, so the rafters, the covering and the planning history all follow the age.

  • Swindon Borough both ways

    Stratton lies inside the borough, so planning questions go to the same council as Swindon itself, and its Building Control team is one of the two routes.

  • Extensions at the back

    A flat-roofed kitchen or a converted garage is common here, and that roof wants a different unit from the main slope.

Units that suit Stratton roofs

A bedroom or landing under a pitched slope usually points to a roof window. The flat-topped kitchen at the back is better lit by a flat rooflight, and a hall or bathroom buried in the middle of the house can take a sun tunnel. The product pages set out sizes, lead times and what fitting involves.

03Our services

Barely out of Swindon, to the north-east

Take the road out of Swindon to the north-east and Stratton St Margaret is 2.4 miles along it, one of the nearest places on our list. Surveys and fitting days both start from the Swindon base, which leaves almost no travel time in the diary and keeps the working day on your roof.

SwindonStratton St Margaret

Stratton roofs

A village centre and the streets around it

Stratton St Margaret began as a village and has been wrapped by Swindon's northern growth without losing its older centre. A few minutes' walk takes you from a lane of old stone and brick to rows of later family housing. That spread of ages decides how any rooflight job here begins, and the stages below follow it outwards from the church.

Stage 01 · By the church

Re-covered roofs near the parish church

The oldest buildings in Stratton stand close to the parish church: small cottages and houses in stone and brick, a number of them with roofs that have been re-covered more than once. The roof spaces tend to be modest. A bedroom or bathroom tucked under the slope is the usual reason for asking about a rooflight, since there is little else to do with that corner of the house.

Nothing about the framing can be taken from the street. A cottage roof may hold rafters of mixed sizes, added props from an earlier alteration or a lining that hides the timbers completely. The plan for a church-side job therefore starts inside the roof space, looking at what carries the covering before a window is drawn onto it.

Position matters as much as product. A slim unit on the back slope lets the lane keep its look, and the front is left alone unless the council's guidance suggests otherwise. Where the lane falls inside a conservation area, the borough publishes the boundary so the street can be looked up directly.

Roofs near the church have often been re-covered with whatever tile or slate was to hand at the time, so a single slope can show two or three different ages of covering. The survey records which course of tiles the unit would interrupt and whether sound matching material is available to close up round the frame.

Stratton house types and what is read first
HouseLikely roofRead first
Village cottageTile or slate, older timbersRafter size and condition
Interwar semiTile, cut raftersLoft height and pitch
Post-war or later estateConcrete tile, trussesTruss layout, estate conditions
Extended rearFlat roof or lean-toDeck, upstand and falls

Stage 02 · Newer estates

Why a newer Stratton roof wants a unit between the trusses

Beyond the old centre the village has been joined by housing from several later decades. Interwar semis, post-war estates and recent culs-de-sac sit side by side, each with its own covering and rafter layout. Concrete tiles are usual on the newer streets, over trusses fixed at a regular spacing.

A trussed roof is a row of factory-made triangles, each timber sized for the load it carries, so cutting through one is a structural decision rather than a quick job. On a newer Stratton house the sensible plan is to pick a unit that fits in the gap between two trusses. The structure stays whole and the opening needs only simple framing round it.

Size codes come into this early. In a VELUX code such as MK04 the letter gives the width class and the digits give the height class, and the data plate on an existing window shows it. Matching the width to the gap between timbers is the main reason a fitting day stays short.

Older cut-rafter roofs, found on the interwar semis, behave differently. The timbers were cut on site, so spacing and size can change up the slope, and a past owner may have altered them. We measure at the point where the unit is meant to go, and any trimming is set down in the plan ahead of the order. Where a rafter has to be trimmed, a header carries the load round the opening, and its timber size is written next to the window code.

The covering is part of the same decision. A flashing kit is made for one tile or slate profile, so we note what is on your roof and order the matching kit with the window, never a generic one improvised from a box on the day. On concrete tiles the kit sits low and the tiles are trimmed to the frame in straight courses.

Between two trusses is where a newer-estate window belongs.

Trussed estate roof

  • Regular spacing set at the factory
  • Unit chosen to sit between two trusses
  • Structure left whole
  • Simple framing round the opening

Older cut-rafter roof

  • Spacing and size may change up the slope
  • Measured where the unit will sit
  • Timber checked for soundness
  • Any trimming written in the plan

Stage 03 · Gardens and garages

The flat-roofed room added at the back

Many houses in a village like Stratton have grown backwards. A flat-roofed kitchen extension, a utility room or a garage turned into living space is a familiar sight, and the room often stays dim because its one window sits at the far end. A flat rooflight or a lantern serves the middle of the floor, which a wall window never reaches.

A flat roof asks different questions from a pitched one. The rooflight sits on a kerb, an upstand of timber or a manufactured unit that lifts the glass above the membrane. We look at the existing deck, the falls that carry rain to the outlet and the condition of the covering before choosing between a frameless unit and a roof lantern. A lantern needs a stronger kerb and a view of the structure below.

Garage conversions raise a point of their own: the roof was often built for a lighter load, so the survey looks at what supports the deck. If you want a larger opening, the job plan says whether steel or extra timber is needed and who designs it. Cutting into a flat roof is building work, and the plan names the Building Control route that applies.

Read off a Stratton flat roof

  • Deck material and its fixings
  • Falls towards the outlet
  • Existing membrane and its edges
  • Kerb height needed for the unit
  • Support below for a larger opening
Flat rooflight on a converted garage roof
03A garage conversion roof with one rooflight

Stage 04 · Hall and landing

Dark landings in the interwar semis

The semis that came between the old centre and the estates were laid out with a stair in the middle of the plan, and the landing above it often has no window at all. Bedrooms take whatever daylight the outside walls give them, while the landing stays dim from morning to evening. People tend to live with it for years because a roof window above it means opening up the ceiling.

A sun tunnel is the lighter answer. A dome on the roof collects daylight, a reflective tube carries it down through the loft and a round diffuser spreads it across the ceiling below. Light is strongest through a short, straight tube. The maker rates a 14-inch one at about a 60W bulb, with that figure shrinking along a longer or bent run. On a landing under a hipped roof the run is usually short, which is the best case for the unit.

Where the loft above a semi is roomy enough to be used, a roof window lights the landing and the stair as well, and it opens up the question of a loft room. The survey measures the height to the ridge and the clear width under the slopes before saying which of the two suits the house.

Hallway with a round daylight diffuser in the ceiling
04Daylight in a ground-floor hall

Stage 05 · One borough

A single council for the whole village

Planning in Stratton St Margaret sits with Swindon Borough Council, the same body that covers Swindon itself, so the route stays short. Building Control can run through the borough or through a registered building control approver, whichever the plan names for your address.

For the rules on rooflights in houses, the rooflight planning permission guide holds the detail. Three things can alter that position for a particular home. The estate's first permission might have carried a clause stripping the householder rights, which is likelier on later streets. The building may be listed. Or the home may be a flat or maisonette, where those rights do not exist.

The older lanes near the church call for a closer look. A house in a conservation area can lose the usual right if the street carries an Article 4 direction of its own, and the borough publishes its conservation area information so the boundary can be checked. We look the address up, write down what turns up and suggest asking the council first whenever the answer is unclear. Where the answer is a plain yes, the plan says so in one line and nothing more is needed. Where an application is the sensible step, the plan says that instead, and the order waits until the borough has replied.

Questions put to the borough about your house

  • Conditions on the original estate permission
  • Conservation area boundary, if any
  • Listed status of the building
  • Flat or maisonette status
  • Building Control route named in writing
Survey sheet, tape measure and pencil on a kitchen table
05The job plan on the kitchen table

Asked by Stratton homeowners

Does a rooflight on a Stratton St Margaret house need planning permission?

Often it does not, since many rooflights on a house count as permitted development, but the answer hangs on the address. An estate condition, a conservation area direction, listed status or a flat can each change it. Swindon Borough Council is the body to ask, and our job plan records what we found for your house. The national rules sit in the planning guide.

Can a window go into a roof built from trusses?

Usually, yes, provided the unit is picked to fit between the trusses so the structure is left alone. Spacing is measured at the survey and a size chosen to suit. For a bigger opening, the plan names the extra support and who is responsible for it, before any order goes in.

My Stratton house has a converted garage with a dim middle. What fits?

A flat rooflight or a lantern, once the roof has been looked at. The garage roof may have been built for a lighter load than a lantern brings, so the survey checks what holds up the deck and the plan states whether extra support is needed.

What is left of the roof after a sun tunnel goes in?

A small dome on the covering, with flashing dressed into the tiles round it. A tube runs down through the loft to a round diffuser in the ceiling. Nearby places such as the village of South Marston and the town of Highworth get the same unit options.

Ask for a Stratton survey

Name the dark room and the type of house, and we will arrange your free survey. After that you get a written quote that sets the unit, the borough's view and the fitting date side by side.

07Get in touch

CallGet a free quote